How to Identify and Eliminate “Alarm Fatigue” in BMS Systems

The primary function of BMS is to provide precise, real-time operational data. However, when the volume of this data exceeds the cognitive capacity of the technical team, the system ceases to be a support tool and instead becomes a source of risk.

This phenomenon, known as “Alarm Fatigue,” is not a staff motivation issue. It is a systemic failure of data filtration that leads directly to human error.

Table of Contents

In an operational context, "Alarm Fatigue," is the state in which an excess of low-priority or false-positive alerts leads to operator desensitization. This results in an increased Mean Time to Acknowledge (MTTA) for all events, including critical ones. The failure to respond in time to an alert about a UPS failure, a leak in a technical room, or a server room over-temperature event is no longer a question of "if," but "when"—and what the financial consequences for Business Continuity will be.

This article is a technical, operational guide for facility managers. Its purpose is to identify the operational symptoms of this phenomenon and to implement a robust, two-pillar protocol (Process and Technology) to eliminate it.

5 Operational Symptoms of "Alarm Fatigue"

To manage risk, you must first measure it. The following symptoms are measurable Key Performance Indicators (KPIs) that signal a high level of alarm fatigue within your facility monitoring systems.

1. Degradation of Key Metrics: MTTA and MTTR

The primary indicator is an increase in the Mean Time to Acknowledge (MTTA). Teams stop acknowledging alerts immediately because they assume it's just more "noise." This directly impacts the Mean Time to Repair (MTTR), as the repair clock starts ticking later. If your system log analysis shows a systematic increase in MTTA for high-priority alerts, this is a red flag.

2. Unauthorized Filtering Rules (Shadow IT)

When the official system fails, technical staff create their own. In practice, this means implementing undocumented rules in email clients (e.g., "move everything from 'bms@system.pl' to 'Junk'"), muting communication channels, or using personal phones to create unofficial support groups. Every such modification is an uncontrolled gap in your information security protocol.

3. Reclassification of Critical Alerts as "False Positives"

System logs or shift reports begin to show entries where objectively critical events (e.g., a momentary power loss on a busbar, a temperature spike) are acknowledged as "bad reading" or "transient." The team, rather than diagnosing the root cause, simply clears the alert to get it "off the screen." This is a direct path to ignoring the warning signs that precede a major failure.

4. Escalation of Reactive Maintenance Incidents

An ideal BMS should support Predictive and Preventive Maintenance. If your cost analysis shows a rising share of reactive "firefighting" work, it means your monitoring system is failing to do its job. Predictive alerts (e.g., increased vibration, higher motor current draw) are being generated by the BMS, but they are lost in the information noise and are not being converted into service work orders.

5. Using a Single Communication Channel as an SPOF (Single Point of Failure)

This is the most serious technical flaw. If an alert about a critical water leak (requiring immediate action) and an alert about low toner in an office printer (requiring action within days) are delivered via the same channel (e.g., email), that channel becomes useless. From a technical perspective, email and push notifications are dependent on the IP network (LAN/WAN/Internet). A failure of that network (due to a fire, flood, or power outage) means that the alert about the failure will not be delivered because of the very failure it was supposed to report. This is a critical design flaw.

Addressing the critical needs of your BMS

SMSEagle can be integrated with the most popular BM / SCADA systems

Additionally we provide custom integration services to tailor SMS solutions to your specific business needs.

Over 40 features for BMS alerts:

SMS alerting for building automation

SMSEagle offers reliable SMS alert systems that send instant messages to building managers and repair teams about urgent problems, system breakdowns, and upkeep reminders. This helps teams to tackle issues right away cutting down on outages and keeping buildings working at their best.

Implementing an Alarm Management Protocol

Eliminating "Alarm Fatigue" requires the implementation of a formal operational protocol, analogous to health and safety or ISO procedures. It consists of two pillars: defining the processes and implementing the right technical architecture.

Pillar 1: PROCESS – Developing the Response Matrix

Before any technology is used, a strategy must be defined. The foundation is a formal "Alarm Priority and Escalation Matrix" document.

A. Categorization and Prioritization (The Three-Tier System)

All possible BMS alerts must be formally categorized. This exercise must be conducted as a workshop with all technical staff and formally approved.

LEVEL 3: CRITICAL (Immediate Response: < 5 minutes)
Definition: An immediate threat to life, health, facility security, or risk of catastrophic financial loss (e.g., production stoppage, data loss).
Examples: Fire alarm, CO/gas detection, UPS power failure, server room/electrical room flood, critical server room over-temperature, access control breach (intrusion).
System Requirement: Must trigger an immediate, intrusive alert to the designated individual.

LEVEL 2: HIGH (Urgent Response: < 1-2 hours)
Definition: Events threatening the continuity of non-critical services, risk of equipment failure, or significant energy waste.
Examples: Failure of one redundant system (e.g., one HVAC pump), generator fault during a test, exceeding power consumption thresholds, unauthorized door-propped-open in a restricted (but not critical) area.
System Requirement: Must generate an alert to the group responsible for that area (e.g., email to the HVAC team).

LEVEL 1: INFORMATIONAL (For Review / Planning)
Definition: Status data, logs, and preventive maintenance triggers. These do not require an immediate response.
Examples: Reaching service motor-hour thresholds, "low fuel" in generator (but not critical), "filter replacement due in 30 days."
System Requirement: These events must never generate a real-time alert. They should be aggregated into a daily/weekly email report or automatically generate a ticket in the CMMS.

B. Defining Escalation Paths and Acknowledgment

The protocol must precisely define what happens when an alert is not acknowledged (ACK).

Rule Example: "CRITICAL (Level 3) alert sent to on-call technician. If no ACK in the system within 5 minutes, the system automatically escalates the alert to the Shift Manager. If no ACK within another 5 minutes, escalate to the Technical Director."

Acknowledgment must be active—the operator must confirm they are taking action on the task, not just that they have read the message.

C. Integrating with the On-Call Roster

The alert system must be integrated with the staff schedule. Sending a P3 alert to the entire technical group is unacceptable. The system must automatically identify who (which specific person) is currently responsible for that area (e.g., "HVAC - Night Shift") and direct the communication only to them.

Pillar 2: TECHNOLOGY – Risk-Based Communication Architecture

Once the process is defined, you select a technical architecture capable of supporting it. The key is to diversify communication channels based on alert priority.

  • For P1 (Informational) Alerts: A passive channel. A write-to-database, automatic tickets in the CMMS, aggregated email reports.
  • For P2 (High) Alerts: An active but non-critical channel. An email to a distribution list, a push notification from the BMS/CMMS app. IP network dependency is acceptable.
  • For P3 (Critical) Alerts: A dedicated, intrusive, and redundant channel is required.

Herein lies the technical crux of the problem: relying on the IP network (Internet, LAN, WiFi) for P3 alerts is a design flaw. A power failure, a switch failure, a DDoS attack, or a simple ISP router outage—all of these eliminate the email and push notification channels.

Solution: Out-of-Band (OOB) Communication

The operational standard for critical communication is to implement a channel that operates completely independently of the main IT infrastructure. The most proven and reliable medium is the GSM network.

Implementing a hardware SMS gateway, such as SMSEagle, solves this problem architecturally.

  • Independence (No SPOF): The device is installed on-premise (within your infrastructure), contains its own SIM card, and connects directly to the cellular network. It operates independently of any router, switch, or internet access failures.
  • Reliability (Out-of-Band): When the BMS (e.g., Johnson Controls, Siemens, Schneider Electric) detects a P3 alert, instead of sending it via the IP network, it passes it directly to the gateway (e.g., via an API or even a simple dry contact). The gateway immediately sends an SMS alert over the GSM network.
  • Intrusiveness and Psychology: SMS is a high-perception-priority channel. It is loud and difficult to ignore.

This separation of channels rebuilds trust in the system. The technical team learns a new, simple rule: "Email is work to be planned. An SMS is an emergency that requires immediate action." This is the foundation for eliminating "Alarm Fatigue."

Conclusion: An Operational Risk Protocol

Alarm fatigue is not a motivation problem; it is a critical operational risk. Eliminating it is not achieved by "disciplining" staff, but by implementing a robust technical protocol.

As a Facility Manager, your responsibility is to ensure the monitoring system is reliable and that its data is properly filtered and routed.

  • Audit: Immediately conduct an analysis of your system logs. Review the 100 most frequent alerts and identify how many are informational "noise" (P1) incorrectly classified as P2 or P3.
  • Implement Process: Develop and formally implement the "Priority and Escalation Matrix." Integrate it with your on-call rosters.
  • Implement Technology: Review your communication architecture. Ensure channel diversification and implement an independent, failure-resistant channel (e.g., GSM SMS) for all Level 3 (Critical) alerts.

Only by taking these steps can you transform your BMS from an irritating noise generator back into a precision tool that ensures business continuity and facility safety.

Automated SMS alerts for BAS / BMS companies

The SMSEagle Alarm Framework for BMS and Critical Infrastructure Systems

BMS systems generate thousands of notifications, leading to “alarm fatigue” where critical alerts (like fire or flood) get lost in the noise. This article explains how to implement the SMSEagle framework to automatically filter and prioritize alerts. You will learn how to build a communication channel (SMS, Voice) that is completely independent of IT network or internet failures by leveraging hardware integration (DI/DO) and redundancy (HA, Multi-SIM). Finally you’ll read about a practical step-by-step implementation plan (Audit, Configuration, Testing) to transform a passive monitoring system into an active, automated emergency response system.

Read More »

Explore our demo device

Contact us